HP-05 / 08

Phasing & Timeline

The campus grows in four phases. Each adds capacity without adding a dining room.

  1. Phase IOnline Q3 2028

    The campus

    • Five-story campus on the existing footprint, with Fryer Array A on Level 1.
    • Driver Throughput Plaza: 400 numbered bays.
    • Hyperplate Power Yard: 300 MW, dedicated entirely to frying.
    • PlateSight™ poles at all eight curb cuts.
    • The Civic Shelf, the commemorative bench, and the QR code.
  2. Phase IIOnline Q2 2029

    Redundancy

    • Fryer Array B on Level 2, in active-active configuration with Fryer Array A.
    • Cheese redundancy raised from N+1 to N+2.
    • A third Aroma Distribution Tower, for the late-night brands.
    • Power Yard expanded to 450 MW.
  3. Phase IIIOnline Q4 2030

    The curb, extended

    • PlateSight™ coverage extended to every curb within 400 m of the campus.
    • Plaza bays narrowed to 1.9 m, raising capacity to 600 bays with no change to the plaza.
    • Holding pattern extended to a second loop for overflow.
  4. Phase IV2031 and beyond

    The Uptown roofline

    • The rooftop drone pad becomes the hub of a network that extends across the entire Uptown roofline.
    • Every flat roof in Uptown is assessed as a potential landing node.
    • Drones hold in a circling pattern above Uptown until cleared to land.
The campus roof with a circular amber and teal drone pad, several delivery drones landing and taking off, and the two exhaust towers, with the library and Uptown rooftops beyond.
Rooftop drone pad, Phase I. The Phase I pad at the northeast corner of the roof. In Phase IV, the rooftops beyond become part of the network.
Next, HP-06Concept VideoThe campus in two minutes, narrated.